Solar Water Pumping Programme
Haryana is an agrarian State and is contributed to national food grains pool, so it needs adequate irrigation facilities for its farmer. To meet the irrigation requirements of farmers of the State and to reduce input cost of harvesting by replacing existing diesel pump sets, Department of New & renewable Energy is providing solar pumps of 3 HP to 10 HP capacity in the State with total 75 % subsidy (30 % Central Financial Assistance under the Pradhan Mantri Kisan Urja Surksha Evam Utthan Mahabhiyaan (PM-KUSUM) & 45 % from the State). These pumps will not provide clean source of power for emerging agriculture pumps but also reduce input cost of farming and thereby help in increase the income of farmers. Pradhan Mantri Kisan Urja Suraksha evam Uthan Mahaabhiyan (PM-KUSUM) scheme of Ministry of New and Renewable Energy is designed to enhance income of the farmers from that part of the land which is barren/fallow and also to reduce cost of irrigation.
The PM-KUSUM scheme has three Components as detailed below: –
Read More
- Updated Specification and Testing procedures for the Solar Photovoltaic (SPV) Water Pumping System and Universal Solar Controller(USPC) 21-04-2023
- Updated Specification and Testing procedure for the Solar Photovoltaic Water Pumping System and USPC (02-02-2023)
- PM-KUSUM Reforms Hindi (26-04-2022)
- PM-KUSUM Reforms English (26-04-2022)
- Simplification of Guidelines for the implementation of PM-KUSUM (14-12-2021)
- List of applicants who have applied for tube-well connection upto 10 HP from 2019-2021 in DISCOMS
- Information, for Selection of Solar water Pumping Systems for Electric Tubewell Connection Applicant of DISCOM(24-04-2023)
- Action to be taken on waiting applications of solar pumps whose work orders are not yet placed-reg.(17-03-2023)
- Regarding extension in completion time for installation of solar water pumping systems under sanction-IV of MNRE,GOI under PMKUSUM.(17-01-2023)
- Regarding extension in completion time for installation of solar water pumping systems under PMKUSUM Phase II and III(11-10-2022)