Solar Water Pumping Programme
Haryana is an agrarian State and is contributed to national food grains pool, so it needs adequate irrigation facilities for its farmer. To meet the irrigation requirements of farmers of the State and to reduce input cost of harvesting by replacing existing diesel pump sets, Department of New & renewable Energy is providing solar pumps of 3 HP to 10 HP capacity in the State with total 75 % subsidy (30 % Central Financial Assistance under the Pradhan Mantri Kisan Urja Surksha Evam Utthan Mahabhiyaan (PM-KUSUM) & 45 % from the State). These pumps will not provide clean source of power for emerging agriculture pumps but also reduce input cost of farming and thereby help in increase the income of farmers. Pradhan Mantri Kisan Urja Suraksha evam Uthan Mahaabhiyan (PM-KUSUM) scheme of Ministry of New and Renewable Energy is designed to enhance income of the farmers from that part of the land which is barren/fallow and also to reduce cost of irrigation.
The PM-KUSUM scheme has three Components as detailed below: –
Read More
- Regarding submitting requisite documents to sort grievances of applicant farmers of solar pumps who are in error list/refund cases/change in category/capacity of the solar pump
- Updated Specification and Testing procedures for the Solar Photovoltaic (SPV) Water Pumping System and Universal Solar Controller(USPC) 21-04-2023
- Updated Specification and Testing procedure for the Solar Photovoltaic Water Pumping System and USPC (02-02-2023)
- PM-KUSUM Reforms Hindi (26-04-2022)
- PM-KUSUM Reforms English (26-04-2022)
- Information/Instructions for applying Solar Water Pumping Systems (2025-26).
- Implementation guidelines for Solar Water Pumping Scheme- year 2025-26.
- Publication of advertisement to invite online application on Saral Portal from beneficiary for promotion of Solar Water Pumping System for the year 2025-26.
- Regarding non consideration of delay penalty exemption request due to non-availability of sites by farmers without farmer intimation and district officer verification under component-B.
- Regarding mentioning of correct date of Work Orders in the online generated JCRs of solar pumps through PM-KUSUM Portal.